Extensive
career in the up- and midstream O&G industry at operational and management
roles as
specialist, coach, leader, organizer and troubleshooter.
Combined
organizational capacity: multi level technical and commercial expertise in multi
cultural environment, with conceptual
thinking and high HSEW standards.
Assignments
spans from managing and planning of international operations, to organizing and
executing commissioning, startup and operation of foreign refineries.
Broad knowledge of O&G production, integrated complex refining, NGL
processing, oil logistics & planning, shipping and trading operations.

Professional
Experience:
Versatec
Energy BV, Woerden, NL, 11.2009
– present
Senior
Consultant
 |
Lead
and perform HaZop studies and act as Chairman.
|
 |
Lead
and perform Operational Readiness Reviews and Pre-Startup Reviews.
|
 | Operations
Manual and Procedures generation and development of Centrica F3-FA North Sea
NG platform |
SOCAR
- Aurora Fujairah Terminal FZC, Fujairah, United Arab Emirates, 11.2011
– 02.2012
Start-up
Terminal Manager
 |
Erected
basic procedures.
|
 |
Assembled
and hired full Terminal Operations Team.
|
 | Prioritized
construction towards Pre-Commissioning and Commissioning/Startup. |
Mott
MacDonald, Seoul, Korea , 03.2010
– 09.2011
Commissioning
Manager Core Group (PMC)
 |
Takreer,
Ruwais Refinery Expansion LSTK PMC Core Team reviewing and supporting EPC
Contractors.
|
 |
Perform
P&ID, HaZop & SIL Reviews with various contractors.
|
 |
Generate
and safeguard integrated Commissioning & Startup planning.
|
 |
Advise
on Interface and Commissioning related issues.
|
 |
Assisting
in process operating engineering issues
|
British
Gas Tunisia [BGT], LPG export Terminal, Gabes, Tunisia
12/2008
– 07/2009
LPG
Commissioning Manager (Owner/Operator PT)
 |
Responsible
for Commissioning & Start-up of Hasdrubal project LPG export Terminal |
Gulf
Petrochemical Services & Trading LLC [GPS], Buraimi, Oman, 10/2008 –
11/2008
Head
of Commissioning (EPCC)
 |
Commissioning
& Start-up management of the
Dolphin - Fahud
Pipeline Compressor Station [Oman Gas Company] |
PT.
Bhakti MingasUtama [BMU], 05/2008
– 08/2008
LPG
Terminal, Sukra-Indramuya, Indonesia
Commissioning
Manager (Owner/Operator/EPCC)
 |
Commissioning
& Start-up management of the Sukra Terminal. |
Purac
Thailand, 04/2007 – 12/2007
Lactic
Acid plant, MapTaPut [Rayong], Thailand,
Commissioning
& Start-Up Advisor
(EPCC/Client Operator)
 |
Advised
/ managed the Commissioning & Startup of the world largest Lactic Acid
plant. |
Takenaka BV
/ Sekisui plant, Geleen, NL,
08/2006 – 12/2006
Commissioning
& Start-Up Manager
(EPC)
 |
Managed
the Commissioning & Startup of a PVB plant.. |
GTI
(part of Suez), Oude
Pekela, NL 03/2006 – 06/2006
Commissioning
/ Construction
Manager (EPC)
 |
Managing
revamp job on NAM (j.v. Shell/Exxon) ZWE/OPK1, |
Snamprogetti
SpA. - San Donato Milanese, Italy / Yanbu, Saudi Arabia. 2005
- 2006
Pre-Commissioning
Manager (EPC)
 |
Managed
the pre-commissioning of a 40 kBPD UOP CCR Cyclemax and 15 kBPD
Isomerisation plant. |
Snamprogetti
SpA. - Mellitah, Libya. 2004
- 2005
Deputy
Commissioning
Manager (EPC)
 |
Executed
part of the commissioning and startup of
a NG & Crude Oil treatment plant in progress. |
Snamprogetti
Ltd. - Szazhalombatta, Hungary. 2004
Commissioning
Manager (EPC)
 |
Managed
the commissioning and startup of a 40 kNm3/hr HTAS Hydrogen generation
plant including Performance testrun. |
Stork GLT
(JV Stork / Jacobs Engineering / Yokogawa / Delaval / Siemens) - Hoogezand,
NL. 2002 - 2003
Commissioning
Coordinator (EPC)
 |
Coordinated
all relevant activities for the commissioning of 2 parallel complete
KingSizeClusters NG treatment unit's [2002] and 3 KSC's parallel [2003] part
of GLT revamp program NAM Slochteren, NL. (JV Exxon/ Shell). |
 |
Increased
commissioning process during 3 months in order to makeup 3 weeks delay. |
 |
Improved
procurement / vendor support and material deliveries process. |
AVR – PRV
- Arnhem, NL. 2001 - 2002
Commissioning
Manager (Owner/Operator)
 |
Coordinated/organized
the commissioning and startup of a ThyssenKrupp EnCoke BFB paperpulpresidue
incineration and conversion unit for Topcrete including steamgeneration. |
 |
Erected
commissioning execution plan in < 1 month. |
 |
Improved
the vendor commissioning process. |
 |
Liaison
for the customer towards the different main- and subcontractors. |
Technip
France SA, TTIL - Alexandria, Egypt. 2000 - 2001
Shift
Controller (EPC Commissioning and Startup)
Grass
root MIDOR refinery.
 |
Lead
and startup integrated complex refinery units. |
 |
Shift
responsible for commissioning and startup of various refinery units. |
 |
Pre-commissioning,
commissioning and startup. |
Koch
Industries - Rotterdam, NL. 1994 – 2000
Manager
Operations,
(Owner/Operator)
midstream market NGC & Light Crude oil Refinery.
Former
EuroStill B.V., subsidiary of J.Aron Company of Goldman Sachs.
 |
Run
the plant in a safe and optimized mode. |
 |
Operated
the NGC refinery safe, with minimal emission and with the maximum
production. |
 |
Independent
within production support budget. |
 |
Tasks:
 |
Managed
unit commissioning, startup and debottlenecking. |
 |
Decreased
potential SH&E incidents. |
 |
Coached
and mentored process operators including training and supervising the
shifts. Responsible for planning personnel. |
 |
Liaison
for 3rd parties related to production. (VOPAK, SGS,
logistics UK) |
 |
Coordinated
production in close cooperation with logistics scheduler and
oiltrader. |
 |
Evaluated
daily workplanning and designed of productionplans. |
 |
Managed
refinery expansion project locally. Pre-study until construction
kick-off. |
 |
Executed
various projects and study’s as: |
 |
Mercury
(Hg) removal hydrocarbons, |
 |
Water
removal Jet-A1 fuel study, |
 |
Logistics
system development/improvement, |
 |
Leader
various HaZops, |
 |
Plant
information historian implementation. |
|
 |
Accomplished
goals;
 |
Erected
all regulations, instructions and procedures related to production
required for operation ating the installation in a timeframe of 6
months according ISO-9004. |
 |
Managed
the operations team and started the unit ahead of the projected
timeframe. |
 |
Total
unit increase of 40%, [6 months] and optimized / debottlenecking the
kerosene treater resulted in increase of 60%, [1 year]. |
 |
Optimized
the refinery - tankstorage logistics and the communication process
UK-NL. |
 |
Lead
part of reorganization process from a hierarchical structure to a
self-steering organization. |
|
Gemeentelijke
Dienst Afvalverwerking - Amsterdam, NL. 1992-1994
Supervisor
Chemical Waste Facility (Municipal Waste Disposal Department)
 |
Interim
manager and Project supervisor during reorganization and upscaling of the
facility. |
 |
Coordinated
implementing of new environmental guidelines (CPR) into new facility. |
 |
Organized
moving of facility to other location. |
BP
Amoco Netherlands Production Company - Offshore, NL. 1990-1992
Production
Supervisor.
 |
Responsible
for the offshore crude oil production. |
 |
Part
of the employee involvement team for a new NG gastreating development. |
Kuwait
Petroleum Europoort B.V. - Rotterdam, NL. 1987-1990
Senior
Area Technician [1990]
Area
Technician [1987]
 |
Operation,
commissioning and startup after construction of various complex refinery
plants. |
Unocal
of the Netherlands B.V. - Offshore, NL. 1982-1987
Offshore
Installation Manager, [1987]
(Helm platform)
1st
Process Operator (shiftleader),
[1986] (Helm platform)
2nd
Process Operator, [1983]
(Hoorn platform)
Utility
man, [1982] (Helder platform)
 |
Various
offshore crude oil production units on North Sea continental shelf. |
 |
Member/chairman
of the safety campaign committee. |

Education
BSc
(Dutch equivalent) Chemical
Engineering 1990
AA
Process Engineering 1979
AA
Mechanical Engineering 1978

Languages
English
German
Dutch
Italian
[limited]
French
(basic)
Arabic
(basic)

Courses
 |
Risk
Management: Risk analyses and approaches. |
 |
Risk
Control (ILCI): Safety policy via organization. |
 |
Safety
related to cargo operations: safe transports on sea and harbor. |
 |
VVA-2:
safety for supervisors (VOL-VCA) |
 |
SMAT:
Safety Management Audit Technique |
 |
PTW:
Work Permit Risk Analyses system. |
 |
Environmental
QA system (MKZS) Chemical waste. |
 |
Media
/ Command post incident training; media training especially for calamities. |
 |
First
aid incl. CPR. |
 |
Market
Based Management. |
 |
"Walking
the talk": coaching/ leadership. |
 |
Selecting
for success: personnel selection. |
 |
The
liberalization of the Dutch electricity market. |
 |
Trends
in production; changing vision approaches. |
 |
CCR
Platforming Process Operations. |
 |
Penex
/ Molex Operations course. |
 |
Operation
of Kongsberg KG2 Gasturbine. |
 |
Honeywell
TDC-3000 LCN operations; usertraining processcontrol system + update UCN. |
 |
Modicon
3000 PLC training; PLC user training |

IT
experiences
Extensive
user of:
 |
MS-Excel,
MS-Word, MS-Office, MS-Access, MS-Powerpoint, MS-Project, Lotus123, Windows, Netscape,
Outlook, IE, eMatrix 9.0., |
 |
PrimaVera
Project Planner P3W. |
 |
PI Processbook rel. 3.0.15.7 & PI Datalink rel. 3.1.6.
|
Processcontrol:
 |
Honeywell
TDC-3000 LCN/UCN, Foxboro rel. 6.1.1, Modicon 3000 PLC, Yokogawa DCS rel.
3.02 |

Keywords
Absorber,
Acidulation, Aerobe Biological watertreating, Amine treating, API separation,
Asphalt Oxidation, Atmospherical Distillation, Biomass conversion, Biomass
separation, Blending, Bubbling Fluidised Bed incineration, Carbon filtration,
Caustic treating, CDU / VDU, Chemical Waste, Claus, Commissioning, Compression,
Construction, Continuous Catalyst Recycling, Cooling Water, CPI separation, DAF,
Debottlenecking, Debutanizer, Decanters, De-ethanizer, De-hexanizer, Delayed
Coker, Desalting, Diesel blending, Diesel oil, Dry bulk handling, Dry bulk
storage, Dry bulk transport, Drying, Electrical Dehydration, ESP, Expertise,
FBR, Fermenting, FG recovery, Flare systems, Flotation separation, Fluegas
treating, FMEA, Foxboro DCS rel. 6.1, Fractionation, Furfural Extraction, Gas
Stripping, Gaslift, Gasoil, Gasturbines, Gaswells, Glycol dehydration, Gypsum
belt filtration, HaZop, Honeywell TDC3000 LCN / UCN, Hydrofinishers, Hydrogen
generation, Interim, ISO, Isomerisation (Penex), JetA1 production, Kerosene
treating, Lactic Acid, Lime, Logistics oil / chemical, Loss Control, LPG
splitting, LPG treater, LPG-desulphurizer, Maintenance, MDEA, Media Filters,
MeOH dehydration, Mercury, Mercurytreating, Molecular Sieve (Molex), MVR,
Naphtha Hydrotreating, Naphtha splitting, NG dehydration, NG production, NGC /
NGL, Offshore, Offsites, Oil production, Oilwells, Onshore, Optimisation,
Oxystripping, PEFS review, Pelletizing, PFD + P&ID review, Pipeline
operations, Planning, Platformer with CCR & Cyclomax, Power generation,
Pre-commissioning, Propane De Asphalting (PDA), Propane Extraction, PSA / VSA,
Pulptransport, QRA, QSHE, Recontacting, Refining, Reorganisation, Safety, Sand
Filters, Scheduling, Sewage, Shipping, Shutdown Co-ordination, Sodium Lactate,
Sour Water, Stabilizer, Start-up, Steamboiling / generation, Stripping, Sugar,
Sulphur solidification, Sulphur unit (Claus), Tailgas, Tankterminal logistics,
Topcrete (cement) transport, Trading, Troubleshooting, UOP / UC, VCA, VDU,
Vacuum Distillation, Wastewater treating, Water filtration, Water injection,
Wiped Film Evaporator, Workover, WWTP.
|